The Point Casino

The Point Casino

W.E. Heuslein traveled to Kingston, WA to help build a brand new 58,000 square foot casino facility. This project was a chance for W.E Heuslein to show the skills of our concrete division. The Point Casino was built in the dead of winter which posed a challenge for our crews. We poured over 1300 yards of concrete in the most challenging conditions (rain and snow). The final product turned out amazing.